The three-storey building with a flat roof was constructed in 1850. Two additional storeys have been added to the construction and have been marked by a wide ledge. The design of the front wall partly reproduces the historical appearance and architectural detail.

Tepelnoizolačný systém

Architekt

TH Architekci - Tadeusz Hardt

Spracovateľ

ALLINVEST Sp. z o.o., Firma Budowlana Marta Fujarczuk

Investor

"AKME" Zdzisław Wisniewski

Lokalita

Wroclaw

Rok

2018

Kategória

Zateplená budova